The five pillars
A working sandbox today, not a slide deck about one. Every feature comes with a phone mockup of the user experience and the backend flow. Every test case maps to the ECB pilot specification. Every milestone is on the roadmap.
Pre-built modules
Onboarding, alias management, liquidity, P2P, e-commerce, m-commerce, NFC proximity, offline payments — every feature comes with a phone mockup of the UX and the backend flow, so teams build on proven foundations from day one.
QA routines & E2E test cases
BDD scenarios aligned with the official ECB pilot specification — Appendix 2.F · End-to-End Process Flows. The same criteria the Eurosystem uses to test pilot participants are the criteria your production integration will eventually be measured against.
Reference architecture
Maps every milestone, feature and integration point — from DESP connectivity through NFC proximity payments — so teams plan, build and validate with confidence.
DESP sandbox
A simulation of the Digital Euro Service Platform built from the published ECB technical requirements — a realistic environment for integration testing before official DESP access is granted.
Implementation roadmap
Pre-mapped to the ECB Pilot Preparation, Development and Operational phases — and reusable as a delivery plan for institutions outside the pilot, since the feature scope (P2P, e-commerce, m-commerce, NFC, offline, funding, defunding, refunds) is the same scope every PSP must eventually support.
D1 risk & resilience
Pre-mapped operational-resilience posture aligned to DORA expectations and the rulebook D1 workstream — ready for supervisory review.

