The five pillars
A working sandbox today, not a slide deck about one. Every feature comes with a phone mockup of the user experience and the backend flow. Every test case maps to the ECB pilot specification. Every milestone is on the roadmap.
Pre-built modules
Onboarding, alias management, liquidity, P2P, e-commerce, m-commerce, NFC proximity, offline payments — every feature comes with a phone mockup of the UX and the backend flow, so teams build on proven foundations from day one.
QA routines & E2E test cases
BDD scenarios aligned with the official ECB pilot specification — Appendix 2.F · End-to-End Process Flows — so every flow is validated against the same criteria the Eurosystem will use.
Reference architecture
Maps every milestone, feature and integration point — from DESP connectivity through NFC proximity payments — so teams plan, build and validate with confidence.
DESP sandbox
A simulation of the Digital Euro Service Platform built from the published ECB technical requirements — a realistic environment for integration testing before official DESP access is granted.
Implementation roadmap
Pre-mapped to the ECB Pilot Preparation, Development and Operational phases — covering every feature across the 11 published milestones, with referenced Appendices and Annexes.
D1 risk & resilience
Pre-mapped operational-resilience posture aligned to DORA expectations and the rulebook D1 workstream — ready for supervisory review.

